Collection date:

August 2011 - August 2011

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

Hornsea Project Two is a second development in the Hornsea Zone in the North Sea off the east coast of the UK. The development has the potential to comprise of several wind farm arrays in the centre of the Hornsea Zone, adjacent to Project One.

The benthic characterisation survey of the Project Two Study area was conducted over seven days in July ...

Categories:
Intertidal Ecology
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Datasets
1
Reports
2