2015, Gardline, Hornsea Project One - Heron Wind and Njord Ventus, Geophysical Survey Export Cable
Summary
Data & downloads
Datasets
Related Pages
Series2016, Fugro, Hornsea Project One - Heron Wind and Njord Ventus, UXO Survey
Fugro was contracted by DONG Energy Wind Power A/S (hereafter known as the client) to undertake a pre-construction and unexploded ordnance (UXO) survey on the Hornsea Project One offshore wind farm (HOW01). The HOW01 site is located approximately 105 km east of Spurn Head and the Humber Estuary, in the western North Sea, United Kingdom. The survey comprised of a geophysical survey of wind turbine generators (WTG) and inter-array cables (IAC) on the western (Lot 1) and eastern (Lot 2) part of the HOW01 site. The geophysical survey was undertaken by the Victor Hensen, Fugro Frontier and Fugro Helmert between June and October 2016. The objectives of the pre-construction UXO and engineering survey were: - Acquire high-resolution bathymetry, sidescan sonar, magnetometer and sub-bottom profiler data in the areas specified; - Acquire information on possible ferromagnetic objects; - Assess acquired magnetometer and acoustic data as instructed by the Employer and the Employers UXO Consultant, with the aim of identifying any potential UXO that may form a threat during installation of the wind farm; - Identify natural and man-made objects at or below the seabed that may affect possible offshore installations; - Identify seabed features and objects at or below seabed, both man-made and geomorphological; - Identify and quantify possible biogenic reefs; - Interpret the shallow subsurface (5 m depth) geology.
Series2016, Bibby HydroMap, Hornsea Project One - Heron Wind and Njord Ventus, Geophysical Survey
Bibby HydroMap Ltd. were commissioned by DONG Energy in May 2016 to undertake a UXO surve y for the Hornsea Project One (HOW01) pre‐construction and UXO survey. The purpose of the survey is to provide information to mitigate the risk of unexploded ordnance (UXO) and information to optimise design and installation methods before construction. The areas to be surveyed are the export cable routes (EC), the inter‐array cable routes (IAC), the interlink cable routes (ILC), wind turbine generator locations (WTG) and the offshore substation locations (OSS). Volume 1a details the operational parameters, locations, times, and techniques utilised during the survey on MV Bibby Athena. Volume 1b details the operational parameters, locations, times, and techniques utilised during the survey on MV Lia. Volume 2 is the. Processing Report which provides details on processing techniques undertaken as part of the contract and Volume 3 details the results of the UXO survey. Volume 4 is the benthic report issued by Benthic Solutions.
2012, RPS, Hornsea Project One - Heron Wind and Njord Ventus, Intertidal Walkover Survey
An archaeological evaluation comprising a walkover survey was undertaken in the intertidal zone adjoining Horseshoe Point, near North Cotes in East Lindsey, Lincolnshire. The survey area covered an area 500 m to either side of the route of the proposed Hornsea Wind Farm Project One onshore cable. The purpose of this survey was to inform the planning process associated with the construction of an overland cable route from an offshore wind farm at Hornsea, East Yorkshire to a new HVDC converter/HVAC substation adjoining the existing power station at North Killingholme, North Lincolnshire. The survey resutls are presented in a series of datasets and reports.
2011, EMU, Hornsea Project One - Heron Wind and Njord Ventus, Intertidal Ecology Field Survey
Hornsea Project Two is a second development in the Hornsea Zone in the North Sea off the east coast of the UK. The development has the potential to comprise of several wind farm arrays in the centre of the Hornsea Zone, adjacent to Project One. The benthic characterisation survey of the Project Two Study area was conducted over seven days in July 2012. The results of this survey will inform the Environmental Impact Assessment (EIA) process, in support of the planning (and consent) application for development of Project Two. The benthic ecology survey, including seabed video, sediment and contaminants sampling and epibenthic trawls was undertaken to acquire data to provide a robust benthic characterisation of the Project Two area.
Series2011, PanGeo, Hornsea Project One - Heron Wind and Njord Ventus, Acoustic Corer Survey for Met Mast
This series documents PanGeo Subsea Acoustic Corer™ survey of the proposed Site W7 met mast location at the Hornsea offshore wind farm. The survey was carried out between 12th March, 2011 and 14th March 2011. The centre of the acoustic core was located at 433723.56 m Easting 5971290.85 m Northing. The survey was carried out to assist on the decision to place the met mast pile foundations. The objective of the survey was to provide 3D sub-bottom acoustically imaged datasets of Site W7.