Summary
Benthic survey results of grab and video sampling conducted over the Thanet Wind Farm to assess the potential impacts of construction works on the benthic ecology across the site. The survey was conducted in September 2022.

Benthic survey results of grab and video sampling conducted over the Thanet Wind Farm to assess the potential impacts of construction works on the benthic ecology across the site. The survey was conducted in September 2022.
Dataset
|Report
|Other
Data
Data
Benthic survey results of grab and video sampling conducted over the Thanet Wind Farm to assess the potential impacts of construction works on the benthic ecology across the site. The survey was conducted in September 2022.
Within this package:
Video
26 Feb 2025
Video Analysis Stills
5 Mar 2025
Appendix A - 2022 survey results and metadata MEDIN
.xlsx
204.80 KB
21 Feb 2025
Appendix B DDV analysis log
1.27 MB
23 Aug 2024
Appendix C - 2022 survey benthic grab species list
.xlsx
34.82 KB
21 Feb 2025
Appendix C - Benthic grab species matrix
.xlsx
42.47 KB
23 Aug 2024
Thanet2022_LOI_20231201
.xlsx
9.13 KB
21 Feb 2025
Thanet_2022_PSA_rev01_20230919
.xlsx
29.11 KB
21 Feb 2025
Thanet_Yr3_TOC
.xlsx
16.01 KB
11 Mar 2025