2022, Natural Power, Thanet, Benthic Survey

2022, Natural Power, Thanet, Benthic Survey

Summary

Benthic survey results of grab and video sampling conducted over the Thanet Wind Farm to assess the potential impacts of construction works on the benthic ecology across the site. The survey was conducted in September 2022.
Categories
Benthic Ecology
Development
Thanet
Industry
Wind
Phase
Post-construction
Organisation
Natural Power
Available in this series
1 Dataset, 1 Report

Data & downloads

Datasets