2010, Renewable Energy Systems, Zone 9 - Celtic Array, Preliminary Selection of Potential Cable Landing Sites

2010, Renewable Energy Systems, Zone 9 - Celtic Array, Preliminary Selection of Potential Cable Landing Sites

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

May 2021

Collection date:

October 2010 - October 2010

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

The proposed Irish Sea Zone development occupies a roughly triangular area extending from approximately 54° 06’ 000” N, 004° 00’ 000” W, south to 53° 34’ 000” N, 004° 00’ 000” W and westwards to 53° 35’ 000” N, 005° 09’ 000” W. The zone thus covers an area of approximately 2200 km2 of which 135 km2 falls inside and 2065 km2 falls outside of territo...

Categories:
Onshore
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Datasets
3
Reports
1