Summary
The overall objective of the task was to undertake aerial surveys of sea birds within the Dogger Bank windfarm site (Round 3 - Zone 3) within the calendar months from April 2010 to June 2012. The methodology being used for the Forewind contract has been developed by HiDef Aerial Surveying Ltd and is based on aerial surveys using digital imaging eq...