2011, Gardline, Westermost Rough Offshore Wind Farm, Geophysical Survey

2011, Gardline, Westermost Rough Offshore Wind Farm, Geophysical Survey

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

May 2021

Collection date:

February 2011 - March 2011

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

Gardline Geosurvey Limited was contracted to survey the proposed Westermost Rough Extension Area and Cable Route Survey between 17-Feb-2011 and 08-Mar-2011. The geological data acquisition programme was carried out by MV Confidante, which sailed from Great Yarmouth and returned to Great Yarmouth upon completion of survey operations.

Reporting for ...

Categories:
Geophysical
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Data Highlights
1
Datasets
9
Reports
1

Data Highlights


Explore the wealth of the data gathered in the 2011, Gardline, Westermost Rough Offshore Wind Farm, Geophysical Survey


4

Geophysical Surveys of the Proposed Westernmost Rough Offshore Wind Farm