2009, CMACS, Burbo Bank, Benthic Grab Survey Year 3

2009, CMACS, Burbo Bank, Benthic Grab Survey Year 3

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

May 2021

Collection date:

September 2009 - September 2009

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

Burbo Offshore Wind Farm is a twenty-five turbine, 90MW development located in Liverpool Bay approximately 6km from the coastlines of Wirral, Crosby and Liverpool. A licence (31864/07/0) was issued under the Food and Environment Protection Act (FEPA) to the wind farm developer, SeaScape Energy Ltd, which allows them to construct and operate the win...

Categories:
Benthic Ecology
Sedimentology
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Reports
1

Deep dive in the data

Choose what you wish to look into:

Dataset

|

Report

|

Other

Report

Report

This report presents and discusses results of the second post-construction benthic survey which was undertaken in September 2009.
Interpretation of the results of each benthic survey for the purpose of wind farm monitoring depends upon understanding of the nature and timing of wind farm construction and operation activities. A summary of major wind farm construction activi...
Read More

Within this package:

Name
File Type
Size
Date

_metadata

17 May 2021

Burbo Post-construction Yr 3 grab survey report v2

.pdf

5.91 MB

8 May 2021

Burbo Post-construction Yr 3 grab survey report v4

.pdf

5.31 MB

8 May 2021