2024, XOCEAN, Moray West Offshore Windfarm, Wind Turbine Generator Debris Survey

2024, XOCEAN, Moray West Offshore Windfarm, Wind Turbine Generator Debris Survey

Summary

Debris clearance surveys following installation of the monopiles and transition pieces at each location, prior to the arrival of a jack-up vessel conducing installation of the Wind Turbine Generator (WTG) assets, to accurately determine water depth and identify all objects or obstructions on the seabed which will influence construction work. In this project, a total of 472 targets were identified, including 4 boulders, 36 pieces of debris, 58 depressions, 360 jack-up footprints, 13 mounds and 1 Unexploded Ordnance (UXO) that has since been removed.
Categories
Engineering DesignGeophysical
Development
Moray West
Industry
Wind
Phase
Construction
Organisation
XOCEAN
Available in this series
3 Datasets, 2 Reports

Data & downloads

Datasets

Data Highlights