2011, Fugro GeoConsulting, Zone 6 - Rampion, Geotechnical Site Investigation

2011, Fugro GeoConsulting, Zone 6 - Rampion, Geotechnical Site Investigation

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

May 2021

Collection date:

April 2011 - June 2011

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

At the request of E.ON Climate and Renewables Fugro GeoConsulting Limited acted as the main contractor for a geotechnical site investigation at the Rampion Offshore Wind Farm Site which is located approximately 13 kilometres south of Brighton, West Sussex within the English Channel.  The field work was performed using the M/V Fugro Saltire from 27 ...

Categories:
Geotechnical
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Datasets
1
Reports
1